Wintering at Kip Marina:

We have setup a small to do list for any vessels that are planning on wintering at Kip Marina or for our resident berth holders that will be wintering on the hard standing. Not all the points listed below will apply to every vessel.

VESSELS REQUIRING FULL TIME USE OF POWER NEED TO HAVE A METER. VESSELS WITH NO METER WILL BE PUT ONTO OUR STANDARD CHARGE TARIFF OF £60.00 PER MONTH.

 

Winter Afloat:

  • Please ensure you have adequate ropes and fenders to suffice through our winter storms.
  • All shore power leads and connections aboard must be maintained and checked prior to leaving a vessel plugged in throughout the winter and meters must be present unless on a Standard Charge tariff.
  • Any covers that may need removing due to bad weather must be done so before departing your vessel or tied well down to sustain through the bad weather.
  • Sails that will not be getting used throughout the winter season are best removed, to prevent them opening unexpectedly in adverse weather conditions.
  • Vessels afloat for the winter, that plan to be sailed etc may leave the sails on. We do ask however, that these are well secured when not in use and a few wraps of the sheets are around headsails.
  • Where possible it is good practice to leave a spare set of keys with the marina reception so we can attend to any issues onboard if needed.

Winter Ashore:

  • The same applies as above with the winter afloat period before your lift out and then again once back in the water.
  • If vessels engines have been winterised before a lift out, please let our marina reception know so this information can be passed onto the yard team if the customer is not going to be present.
  • Any tows that are required to and from the hoist pier will be charged at a minimum of £60.00.
  • All sails must be removed prior to lift out to ensure maximum safety when on the hard standing.
  • Covers need to be well tied down.
  • Shore power connections must have a visible meter unless on a standard charge tariff. Please where possible can these meters be installed inline at the box to minimise staff climbing slippery ladders.
  • When working on your vessel that is on the hard standing, please be mindful of where your car is parked. We have heavy machinery operating 7 days a week and you may be required to move it at short notice.
  • At no point are you allowed to dry sand antifoul unless prior arrangement is made with the marina management. This is to protect all customers and staff.
  • Any vessels requiring sand blasting/antifoul removal must please make the marina aware of this so we can position your vessels appropriately.

 

Mast stepping and un-stepping:

  • All sails to be removed prior to the mast being un-stepped.
  • Electrics are to all be disconnected.
  • Where possible split pins removed for turn buckles and rigging eased off slightly to ensure smooth, efficient removal of the mast.
  • Where rigging is being replaced or fixed, we need the rigger to be present or at a minimum the owner, where possible.
  • Kip Marina purely supply crane hire and the safe removal and installation of your mast, we do not provide a rigging service or rig tensioning service.
  • We will do our best to store your mast as close to your vessel as possible, however this may not always be possible
August 19, 2021
Winter Picture

Winter Checklist

Wintering at Kip Marina: We have setup a small to do list for any vessels that are planning on wintering at Kip Marina or for our […]
May 10, 2019
PelleP YL ad_April_2019

Pelle P Kip Regatta Entry List & Amendments to SI

Good luck to all our competitors who are taking part in this weekend’s Pelle P Kip Regatta. Amendments to Sailing Instructions for Pelle P Kip Regatta […]
February 21, 2019
19-0407-MAR UK Roadshow Banners 2

Raymarine Roadshow – Sunday 3rd March

The Raymarine Roadshow – Kip Marina Sunday 3rd March 10am – 4pm The purpose of this Roadshow is to enable Raymarine to support end customers in […]
May 11, 2018
Pelle P Kip Regatta YL page 3

Pelle P Kip Regatta Entry List

Pelle P Kip Regatta Entry List Kip 18 Entries and Classes RC
May 11, 2018
Pelle P Kip Regatta YL page 3

Pelle P Kip Regatta Amendments to Sailing Instructions

Amendments to Sailing Instructions – Pelle P Kip Regatta 2018 Pelle P Kip Regatta 2018 AMENDMENT 1